Customizing and Updating the PDU

Configuring and testing. Configuring and testing of the switch is done through the EPO interface on the PDU monitoring unit. The figure to the right shows the PDU monitoring unit and the location of the EPO LEDs and DIP switches.

Testing the switch

1.Before testing the EPO switch, verify that the EPO DIP switches on the PDU monitoring unit are configured properly for the signal type you are using. The labels above the switches and the following figure show the correct settings for both the Normally Open (NO) and Normally Closed (NC) position.

Location of switches on PDU monitoring unit

2.Test the EPO switch to ensure that it is wired and working correctly:

a.Place the Arm/Test rocker switch in the Test position. The EPO state LEDs will be off and the PDU display interface will show the following alarm (in addition to any other active alarms):

Active Alarm xxofxx

EPO Ready to Test

b.Engage the EPO switch. (If your switch is momentary, engage it with one person watching the EPO state LEDs, and another at the EPO switch.)

50

60kW InfraStruXure PDU—Operation and Configuration

Page 58
Image 58
American Power Conversion PDRPPH1000, PD60H5HK1 manual Testing the switch