Install
Lubrication Chart
Maintenance
Tripod Ground Mount Assembly Azimuth Beam
B.Procedure
Move the antenna in azimuth to obtain a null, then move ± in elevation to obtain a large peak signal. If not, move the antenna in the opposite azimuth direction through the peak and again move ± in elevation to obtain a large peak signal. If a larger peak is not found, you were on the main lobe
Step Theodolite Height Adjustment Step Step Step
5 Optimum Polarization Setting
Customer Service Center
Repeat preceding with the FEED CCW/OFF/CW switch in the alternate operat- ing position
Page 44
Image 44
Table 3
44
Installation Procedures
Page 43
Page 45
Page 44
Image 44
Page 43
Page 45
Contents
Type ES93
Installation, Operation and Maintenance
9.3-MeterESA
9.3-MeterEarth Station Antenna
Table of Contents
Table of Contents
How to Use This Manual Getting Started
Installation Procedures Operation Preventive
Introduction
9.3-MeterEarth Station Antenna
Introduction
Customer Service Center
Proprietary Data Information and Assistance
Notice Technical Assistance
24-hourTechnical Assistance
How to Use This Manual
How to Use This Manual
Overview Content
Getting Started
Getting Started
Overview Warnings
Recommended Tools
Tool
Size
Quantity
Parts Verification
Reporting Equipment Loss or Damage
Reporting Visible Loss or Damage Reporting
Concealed Damage Inventory Equipment Received
Returning Equipment Step Step Step Step Step
Getting Started
Overview Foundation Preparation
Installation Procedures
Installation Procedures
A-325Tensioning Step Step Step Step Step Step
Use Felt Marker Before After
Tensioning Tensioning
Installation Procedures
Installation Procedures
Tripod Ground Mount Assembly Azimuth Beam
Assembly Step Step Step
Use 1 in. 25 mm flatwashers and hex nuts
Step
Installation Procedures
Use 7/8 x 2-1/4in 57 mm bolts and nuts Figure
Support Legs Assembly Step Step
Installation Procedures
Step Step
Installation Procedures
Use 7/8 x 2-1/4in 57 mm bolts and nuts
Installation Procedures
Step Step
Installation Procedures
Step
Panning Frame Assembly Step Step Step
Installation Procedures
Use 3/4 by 3.0 inch 75 mm hardware
Installation Procedures
Step Step
Use 7/8 by 2-1/2inch 64 mm hardware
Installation Procedures
Step
Use 7/8 by 2-1/4in 57 mm hardware
Installation Procedures
Step Step
Azimuth Jack Screw Assembly Step Step
Installation Procedures
Step Step Step
Installation Procedures
Figure 19A Figure 19B
Installation Procedures
Step
Elevation Jackscrew Assembly Step Step
Installation Procedures
Use 7/8 by 2-1/4in 57 mm hardware
Installation Procedures
Step
Grounding Cable Attachment Step
Installation Procedures
Use supplied 7/8 by 2-3/4in 70 mm bolts and nuts
Installation Procedures
Step Step
Installation Procedures
Reflector Backstructure Assembly Feed Rotating
Tube Assembly Step
Use 3/8 x 2 in 51 mm hardware provided
Installation Procedures
Step Step
Jack Tripod Assembly Step Step Step Step
Installation Procedures
Reflector Assembly Step Step
Installation Procedures
Installation Procedures
Step
Installation Procedures
Step Step
Step Subreflector Assembly Step
Installation Procedures
Step Step Step Step Step
Installation Procedures
Step Step
Theodolite Assembly Theodolite Installation Step
Installation Procedures
Installation Procedures
Step
Theodolite Leveling Step Step Step
Installation Procedures
Installation Procedures
Step Step
Step Theodolite Height Adjustment Step Step Step
Theodolite Centering Step Step Step Step Step
Installation Procedures
Step
Installation Procedures
Reflector Panel Adjustment Step Step Step Step
Step Step Step Step
Installation Procedures
Subreflector Adjustment Step Step Step Step
Installation Procedures
Subreflector Offset Tilt Adjustment Step Step
Top Stud Nut Adjustment
Offset Operating Angle
Installation Procedures
Installation Procedures
Reflector/Back structure to Ground Mount Assembly
Installation Step Step
Installation Procedures
Step Step Step Step Step
Operation
Operation
Overview Acquiring A Satellite
Step Step Step Step Step Step
Operation
Operation
Move the antenna in azimuth to obtain a null, then move ± in elevation to obtain a large peak signal. If not, move the antenna in the opposite azimuth direction through the peak and again move ± in elevation to obtain a large peak signal. If a larger peak is not found, you were on the main lobe
Step Step Step
Figure 4-5 Optimum Polarization Setting
Step
Operation
Figure 4-4 Maximizing Odd Transponders
Subreflector Adjustment
Operation
Preventive Maintenance
Preventive Maintenance
Overview General Cleaning Electrical Parts
Preventive Maintenance
Mechanical Parts Inspection Local Control/Motor
Drive Controller
Antenna
Preventive Maintenance
Preventive Maintenance
Operate the azimuth and elevation drives as well as the feed rotation in both the plus
Step
Drive System Voltage and Current Checks Step Step
Preventive Maintenance
Step Step Step Step Step Step
Preventive Maintenance
Repeat preceding step 3 with the FEED CCW/OFF/CW switch in the alternate operat- ing position
Preventive Maintenance
Preservation of Component Parts Aluminum Parts
Galvanized Surfaces Lubrication
Preventive Maintenance
Jackscrews/Motors Gear Motor/Housing Fill Drain
Requirements
Lubrication Chart
Preventive Maintenance
Preventive Maintenance
6 7
High-SpeedAntenna Lubrication Points
Medium-SpeedAntenna Lubrication Points
Preventive Maintenance
APPENDIX ‘A’
AZ = 180 + arc tan tan θ/sin α
AZ = 360 - arc tan tan θ/sin α
EL = 90 - T - R
A.Tools Required
B.Procedure
APPENDIX ‘B’ Sector Change Process