Subreflector
Offset Tilt
Adjustment
Step 1
Step 2
Step 3
Step 4
Step 5
Refer to Table 4 and Figure 43. Adjust top subreflector jam nuts (two) the distance indi- cated according to the offset pointing angle in Table 4. Make the desired adjustment using the floating ring and subreflector jam nuts.
Note: Before making any adjustment, mark the starting position of the jam nuts in rela- tion to the floating ring with a pencil, then mark the floating ring to indicate the proper distance of the turn.
| Table 4 |
|
|
Offset Operating Angle | Top Stud Nut Adjustment |
|
|
10° - 20° | |
30° | |
40° | |
50° | 1 turn |
60° | 7/8 turn |
Table 4 shows the distance the subreflector must be lowered. Use only the top adjust- ment stud to obtain the proper offset tilt.
Once the offset tilt adjustment is completed, do not disturb adjustments.
Match mark the subreflector subassembly and the floating ring. Remove 3/4” (19 mm) jam nuts and washers and lower the subreflector subassembly. Place subreflector subassem- bly in safe location to secure it from damage during reflector/backstructure installation.
Remove theodolite and theodolite mounting assembly from feed support tube.
Figure 43
46 | Installation Procedures |