Blodgett MARK V XCEL CONVECTION OVEN manual Installation, Initial Startup, Oven Restraint

Models: MARK V XCEL CONVECTION OVEN

1 37
Download 37 pages 11.54 Kb
Page 13
Image 13
Initial Startup

Installation OVEN RESTRAINT

Initial Startup

OVEN RESTRAINT

If casters are used in conjunction with a power supply cord for movable appliances, a fixed re- straint should be provided.

The restraint (ie: heavy gauge cable) should be at- tached without damaging the building. DO NOT use the gas piping or electrical conduit for the at- tachment of the permanent end of the restraint! Use anchor bolts in concrete or cement block. On wooden walls, drive hi test wood lag screws into the studs of the wall.

If the oven is moved from its regular location, the restraint must be reconnected when the oven is re- turned.

1.Mount the supplied bracket to the leg bolt just below the power cord.

2.Attach the clip on restraining cable to the mounting bracket.

Back of Oven

Restraint Cable

Bracket

Double stacked unit shown. Use the same procedure for single units.

Figure 8

ADJUSTMENTS ASSOCIATED WITH INITIAL INSTALLATION

Each oven, and its component parts, have been thoroughly tested and inspected prior to ship- ment. However, it is often necessary to further test or adjust the oven as part of a normal and proper installation. These adjustments are the responsi- bility of the installer, or dealer. Since these adjust- ments are not considered defects in material or workmanship, they are not covered by the Original Equipment Warranty. They include, but are not limited to:

Dcalibration of the thermostat D adjustment of the doors

D leveling

D tightening of fasteners.

No installation should be considered complete without proper inspection, and if necessary, ad- justment by qualified installation or service per- sonnel.

9

Page 13
Image 13
Blodgett MARK V XCEL CONVECTION OVEN manual Installation, Initial Startup, Oven Restraint