Blodgett MARK V XCEL CONVECTION OVEN manual Installation, Oven Assembly, Sanitation Bolts

Models: MARK V XCEL CONVECTION OVEN

1 37
Download 37 pages 11.54 Kb
Page 8
Image 8
Oven Assembly

SANITATION BOLTS Installation

Oven Assembly

SANITATION BOLTS

These bolts are required by NSF to block any ex- posed hole on the back of an oven. This includes:

Dany unit, single or stacked, without a back panel.

Dany holes in stacked units not used for mount- ing stacking brackets.

1.Locate the 5/16” bolts that were shipped with the oven.

2.Install the bolts as shown in Figure 2.

Double Stacked Units
Units without back panels

Figure 2

4

Page 8
Image 8
Blodgett MARK V XCEL CONVECTION OVEN manual Installation, Oven Assembly, Sanitation Bolts, Double Stacked Units