2. INSTALLATION

<For Americas 220V specifications>

(1) Power switch

(2) Screws [2 pcs]

Operator

4145M

(3) 3-pin power supply connector

(4) Power cord

(5) Staples [5 pcs]

1. Attach an appropriate plug to the power cord (4). (The green and yellow wire is the ground wire.)

2. Insert the power plug into a properly-grounded electrical outlet.

NOTE:

Take care when tapping in the staples (5) to make sure that they do not pierce the cords.

Do not use extension cords, otherwise machine operation problems may result.

Green and yellow wire (ground wire)

0589D

S-7000DD

10