![](/images/backgrounds/53443/53443-5219x1.png)
2. INSTALLATION
<For Americas 220V specifications>
(1) Power switch
(2) Screws [2 pcs]
Operator
4145M
(3)
(4) Power cord
(5) Staples [5 pcs]
1. Attach an appropriate plug to the power cord (4). (The green and yellow wire is the ground wire.)
2. Insert the power plug into a
NOTE:
・ Take care when tapping in the staples (5) to make sure that they do not pierce the cords.
・ Do not use extension cords, otherwise machine operation problems may result.
Green and yellow wire (ground wire)
0589D
10 |