2. INSTALLATION

<For 100V/400V system specifications>

(1) Power switch

(2) Screws [2 pcs]

Operator

4145M

(3) Transformer box

(4) Transformer box plates [2 pcs]

(5) Screw [with washer]

(6) 3-pin power supply connector

(7) Staples [5 pcs]

(8) Cord clamps [2 pcs]

(9) Power cord

1. Attach an appropriate plug to the power cord (9). (The green and yellow wire is the ground wire.)

2. Insert the power plug into a properly-grounded electrical outlet.

NOTE:

Take care when tapping in the staples (7) to make sure that they do not pierce the cords.

Do not use extension cords, otherwise machine operation problems may result.

Green and yellow wire (ground wire)

0590D

11

S-7000DD