
2. INSTALLATION
<For 100V/400V system specifications>
(1) Power switch
(2) Screws [2 pcs]
Operator
4145M
(3) Transformer box
(4) Transformer box plates [2 pcs]
(5) Screw [with washer]
(6)
(7) Staples [5 pcs]
(8) Cord clamps [2 pcs]
(9) Power cord
1. Attach an appropriate plug to the power cord (9). (The green and yellow wire is the ground wire.)
2. Insert the power plug into a
NOTE:
・ Take care when tapping in the staples (7) to make sure that they do not pierce the cords.
・ Do not use extension cords, otherwise machine operation problems may result.
Green and yellow wire (ground wire)
0590D
11 |