C H A P T E R 3
Installing the Switch
This chapter describes how to install the Catalyst 4900 series switch. For
•Verifying the Contents, page
•
•Connecting AC Power to the Switch, page
•Connecting DC Power to the Switch, page
Note Before starting the installation procedures in this chapter, complete the site planning checklist in Chapter 2, “Site Planning,” to verify that all planning activities were completed.
Verifying the Contents
Note Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store them. You will need the container if you need to move or ship the switch in the future.
|
| Catalyst 4900 Series Switch Installation Guide |
|
|
|
|
| ||
|
|
| ||
|
|
|