C H A P T E R 3

Installing the Switch

This chapter describes how to install the Catalyst 4900 series switch. For first-time installations, perform the procedures in the following sections in the order listed.

Verifying the Contents, page 3-1

Rack-Mounting the Switch, page 3-2

Connecting AC Power to the Switch, page 3-9

Connecting DC Power to the Switch, page 3-11

Note Before starting the installation procedures in this chapter, complete the site planning checklist in Chapter 2, “Site Planning,” to verify that all planning activities were completed.

Verifying the Contents

Note Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store them. You will need the container if you need to move or ship the switch in the future.

 

 

Catalyst 4900 Series Switch Installation Guide

 

 

 

 

 

 

78-18039-02

 

 

3-1

 

 

 

Page 47
Image 47
Cisco Systems 4900 Series manual Installing the Switch, Verifying the Contents