Chapter 3 Installing the Switch

 

Rack-Mounting the Switch

 

Table 3-1

Rack-Mount Kit Checklist

 

 

 

 

 

 

Quantity

Part Description

Received

 

 

 

 

4

12-24 x 3/4-inch Phillips binder-head screws

 

 

 

 

 

 

4

10-32 x 3/4-inch Phillips binder-head screws

 

 

 

 

 

 

Note Figure 3-2illustrates how to attach the front of the switch to the rack. You can also attach the rear of the switch to the rack, depending on the configuration of your rack.

Step 2 Note that the L brackets connect the chassis to the rack. You can mount the

L brackets to the front or rear mounting holes of the chassis, depending on which end is in the front of the rack.

Note Some equipment racks provide a power strip along the length of one of the rear posts. If the rack has this feature, consider the position of the strip when planning fastener points. Before installing the L brackets on the chassis, determine whether to install the chassis from the front or the rear of the rack.

Attach the left and right L brackets using the M4 Phillips flat-head screws provided in the rack-mount kit. (See Figure 3-2.)

Figure 3-2 Attaching the L Brackets to the Switch

PS1

 

 

 

Catalyst WS-C4948 10GE

PS2

 

 

 

FAN

 

 

 

 

STATUS

 

 

 

X2-1

1

 

 

 

X2-2

 

 

 

 

16

17

 

 

 

 

32

33

CON

MGT

 

 

 

48

 

Step 3 Install the chassis in the rack as:

a.Position the chassis in the rack as follows (see Figure 3-3):

130086

 

 

Catalyst 4900 Series Switch Installation Guide

 

 

 

 

 

 

78-18039-02

 

 

3-7

 

 

 

Page 53
Image 53
Cisco Systems 4900 Series manual Attaching the L Brackets to the Switch