C H A P T E R 2
Site Planning
This chapter describes how to prepare your site for installation of the switch and contains these sections:
•Site Environmental Requirements, page
•Site Power Requirements, page
•Grounding Requirements, page
•Safety Overview, page
•Site Planning Checklist, page
For detailed information about cabling requirements, see Chapter 4, “Transceiver Modules.”
Note A site planning checklist is provided on page
Site Environmental Requirements
Planning a proper location for the switch and layout for your equipment rack or wiring closet is essential for successful system operation. You should install the switch in an enclosed, secure area, ensuring that only qualified personnel have access to the switch and control of the environment. Equipment that is placed too closely together or that is inadequately ventilated can cause system overtemperature conditions. In addition, poor equipment placement can make chassis panels inaccessible and difficult to maintain.
|
| Catalyst 4900 Series Switch Installation Guide |
|
|
|
|
| ||
|
|
| ||
|
|
|