Chapter 3 Installing the Switch
Connecting AC Power to the Switch
Figure 3-4 Installing the Cable Guide
PS1
PS2
FAN
STATUS
1
16 | 17 |
32 | 33 |
| Catalyst |
CON | MGT |
48 |
|
130089
Step 5 Do not connect the power cord at this time. Proceed to the “Connecting AC Power to the Switch” section on page
Connecting AC Power to the Switch
Follow these steps and warnings when connecting power to a Catalyst 4900 series switch:
Step 1 Prior to connecting the power supply to a power source, ensure that all of the site power and grounding requirements described in Chapter 2, “Site Planning,” have been met and the chassis is properly grounded as described in the “Grounding Requirements” section on page
Warning The
Step 2 Plug the power cords into the power supplies. (Figure
|
| Catalyst 4900 Series Switch Installation Guide |
|
|
|
|
| ||
|
|
| ||
|
|
|