Chapter 2 Site Planning

Site Power Requirements

You will also need to provide power to the switch with the appropriate AC power cord for your location. Table 2-1lists the power cords that are used with the AC power supply.

Table 2-1

AC-Input Power Cord Options

Locale

Part Number

Length

Plug Rating

Plug Type

 

 

 

Appliance

 

300 W AC Power Supply

 

Coupler

120352

 

 

 

 

North America

CAB-US515-C15-US=

8.2 ft (2.5 m)

125 VAC, 15 A

NEMA 5-15P

 

(was CAB-7KAC=)

 

 

 

 

 

 

 

120354

 

CAB

13.2 ft

250 VAC, 16 A

NEMA 6-20

 

 

(4.0 m)

 

non-locking

 

 

 

 

120355

 

CAB

13.6 ft

250 VAC, 16 A

NEMA L6-20

 

 

(4.1 m)

 

 

 

 

 

 

120361

Australia,

CAB-AS3112-C15-AU=

8.2 ft (2.5 m)

250 VAC, 15 A

SAA/3,

New Zealand

(was CAB-7ACA=)

 

 

AS/NZS 3112-1993

 

 

 

 

120356

Europe (except

CAB-CEE77-C15-EU=

8.2 ft (2.5 m)

250 VAC, 16 A

CEE 7/7

Italy)

(was CAB-7ACE=)

 

 

 

 

 

 

 

120357

Catalyst 4900 Series Switch Installation Guide

 

78-18039-02

2-5

 

Page 41
Image 41
Cisco Systems 4900 Series manual Cab