Chapter 2 Site Planning
Site Power Requirements
You will also need to provide power to the switch with the appropriate AC power cord for your location. Table
Table |
Locale | Part Number | Length | Plug Rating | Plug Type |
|
|
| Appliance |
|
300 W AC Power Supply |
| Coupler | 120352 | |
|
|
|
| |
North America | 8.2 ft (2.5 m) | 125 VAC, 15 A | NEMA | |
| (was |
|
|
|
|
|
|
| 120354 |
| CAB | 13.2 ft | 250 VAC, 16 A | NEMA |
|
| (4.0 m) |
| |
|
|
|
| 120355 |
| CAB | 13.6 ft | 250 VAC, 16 A | NEMA |
|
| (4.1 m) |
|
|
|
|
|
| 120361 |
Australia, | 8.2 ft (2.5 m) | 250 VAC, 15 A | SAA/3, | |
New Zealand | (was |
|
| AS/NZS |
|
|
|
| 120356 |
Europe (except | 8.2 ft (2.5 m) | 250 VAC, 16 A | CEE 7/7 | |
Italy) | (was |
|
|
|
|
|
|
| 120357 |
Catalyst 4900 Series Switch Installation Guide
| ||
|