Chapter 3 Installing the Switch
Connecting DC Power to the Switch
Step 1 Prior to connecting the power supply to a power source, ensure that all of the site power and grounding requirements described in Chapter 2, “Site Planning,” have been met and the chassis is properly grounded as described in the “Grounding Requirements” section on page
Step 2 Remove the safety cover from the power terminal.
Step 3 Connect the power supply ground terminal to earth ground.
Figure 3-6 DC Power Supply
DC input terminals
Handle
Status LEDs
120697
Step 4 Connect the positive and negative power cables into the power supplies using a number 2 Phillips screwdriver.
Note The DC power cables may use AWG #10 to AWG #12 wire.
| Catalyst 4900 Series Switch Installation Guide |
|