
Chapter 3 Installing the Switch
–If the chassis front panel is in the front of the rack, insert the rear of the chassis between the mounting posts.
–If the rear of the chassis is in the front of the rack, insert the front of the chassis between the mounting posts.
b.Align the mounting holes in the L bracket with the mounting holes in the equipment rack.
c.Secure the chassis using four (two on each side)
d.Use a tape measure and level to ensure that the chassis is installed straight and level.
Figure 3-3 Installing the Switch in the Rack
PS1
PS2
FAN
STATUS
1
16 | 17 |
32 | 33 |
| Catalyst |
| |
| |
CON | MGT |
48 |
|
130087
Step 4 Attach the cable guide to the right or left side of the chassis mount.
| Catalyst 4900 Series Switch Installation Guide |
|