Chapter 3 Installing the Switch

Rack-Mounting the Switch

Your own ESD grounding strap or the disposable ESD strap included with the system

The following tools and equipment are required to install the chassis in a rack:

Rack-mount kit

Tape measure and level

Rack-Mounting the Switch

Note The illustrations shown are of a Catalyst 4948-10GE switch. The process for the Catalyst 4948 and Catalyst 4928-10GE is identical.

Follow these steps to install the switch in a rack.

Step 1 Prepare for installation:

a.Place the chassis on the floor or on a sturdy table as close as possible to the rack. Leave enough clearance to allow you to move around the chassis.

b.Use a tape measure to measure the depth of the rack. Measure from the outside of the front mounting posts to the outside of the rear mounting strip. The depth must be at least 19.25 inches (48.9 cm) but not greater than

32 inches (81.3 cm).

c.Measure the space between the inner edges of the left front and right front mounting posts to ensure that it is 17.75 inches (45.09 cm) wide. (The chassis is 17.5 inches [44 cm] wide and must fit between the mounting posts.)

d.Open the rack-mount kit, and refer to Table 3-1to verify that all parts are included.

Table 3-1 Rack-Mount Kit Checklist

 

 

 

Quantity

Part Description

Received

 

 

 

 

 

2

L brackets

 

 

 

 

 

 

 

8

M4 x 8 mm Phillips flat-head screws

 

 

 

 

 

 

 

 

 

 

 

Catalyst 4900 Series Switch Installation Guide

 

 

 

 

 

 

3-6

 

 

 

 

78-18039-02

 

 

 

 

 

 

Page 52
Image 52
Cisco Systems 4900 Series manual Rack-Mounting the Switch, Quantity Part Description Received