Chapter 2 Site Planning
Site Power Requirements
•EMI Recommendations, page
•Power Requirements and Heat Dissipation, page
Pre-installation Requirements
Follow these requirements when preparing your site for the switch installation:
•Connect each switch to separate wiring on a dedicated circuit; provide each switch with its own branch circuit connection with sufficient overcurrent protection and direct grounding to the branch circuit.
•To prevent a loss of input power, be sure the total maximum load on each AC circuit is within the current ratings of the wiring and breakers.
Warnings and Cautions
Follow these precautions when preparing your site for the switch installation:
Caution The total maximum load on each
Warning Read the installation instructions before connecting the system to the power source. Statement 1004
Warning Installation of the equipment must comply with local and national electrical codes. Statement 1074
Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Statement 1040
|
| Catalyst 4900 Series Switch Installation Guide |
|
|
|
|
| ||
|
|
| ||
|
|
|