Phase 5: Documenting the Network – Sample outputs Centre (2500)

Configuration Management documentation

Centre#show cdp neighbors

Capability Codes: R - Router, T - Trans Bridge, B - Source Route Bridge

 

S - Switch, H - Host, I - IGMP

 

 

Device ID

Local Intrfce

Holdtme

Capability Platform Port ID

Boaz

Ser

0

153

R

2500

Ser

0

Eva

Ser

1

140

R

2500

Ser

1

Centre#show ip route

Codes: C - connected, S - static, I - IGRP, R - RIP, M - mobile, B -

BGP

D - EIGRP, EX - EIGRP external, O - OSPF, IA - OSPF inter area E1 - OSPF external type 1, E2 - OSPF external type 2, E - EGP

i - IS-IS, L1 - IS-IS level-1, L2 - IS-IS level-2, * - candidate default

U - per-user static route

Gateway of last resort is not set

172.16.0.0/16 is subnetted, 4 subnets

C172.16.128.0 is directly connected, Serial1 C 172.16.32.0 is directly connected, Ethernet0

I 172.16.96.0 [100/8576] via 172.16.64.2, 00:00:57, Serial0 C 172.16.64.0 is directly connected, Serial0

Centre#show ip protocol Routing Protocol is "igrp 11"

Sending updates every 90 seconds, next due in 50 seconds Invalid after 270 seconds, hold down 280, flushed after 630 Outgoing update filter list for all interfaces is not set Incoming update filter list for all interfaces is not set Default networks flagged in outgoing updates

Default networks accepted from incoming updates IGRP metric weight K1=1, K2=0, K3=1, K4=0, K5=0 IGRP maximum hopcount 100

IGRP maximum metric variance 1 Redistributing: igrp 11 Routing for Networks: 172.16.0.0

Routing Information Sources:

Gateway

Distance

Last Update

172.16.128.2

100

00:40:35

172.16.64.2100 00:01:07

Distance: (default is 100)

Centre#show ip interface brief

Protocol

Interface

IP-Address

OK? Method Status

Ethernet0

172.16.32.1

YES manual up

up

Ethernet1

unassigned

YES unset administratively down down

Serial0

172.16.64.1

YES manual up

up

Serial1

172.16.128.1

YES manual up

up

146 - 238 CCNA 2: Routers and Routing Basics v3.1 Instructor Guide – Case Study

Copyright 2004, Cisco Systems, Inc.

Page 147
Image 147
Cisco Systems CCNA 2 manual Phase 5 Documenting the Network Sample outputs Centre, Configuration Management documentation