HotCup Operators’ Guide Initial Setup
November, 2007 23 6740001
l. Test the brewer to be sure the paper feeds properly: On the service keypad, press ,
then press until the display shows BREW TEST.
i. Press to test each brewer position:
WARNI NG
Keep away from the brewer mechanism while it is operating.
Coming into contact with moving parts could injure you.
BREW 'R BREW The brewer is in the clamp position.
BREW 'R HOMe The brewer is in the open position.
ii. Make sure the filter paper feeds properly without jamming.
iii. Replace the cup station and grounds bucket.
5. Install the Optional Coin Box Lock
a. Install the lock cylinder, washer, and nut in the
order shown.
b. Tighten the nut.
c. Install the lock bar as shown, and secure with
the screw.
6. Set Up and Load the Coin Mechanism
Standard Coin Mechanism
Setting the Quarter Switch. If your coin
mechanism is not a MARS TRC 6000, skip this
procedure and begin LOADING THE COIN
MECHANISM.
a. Flip down the front of the coin mechanism as
shown, and set the quarter switch.
Load the Coin Mechanism.
a. Open the cabinet door and the monetary door.
b. Insert coins into their respective tubes until each tube has been filled.
c. Inspect the tubes for shingled coins and correct if necessary.
LOCKBAR
SCREW
NUT
WASHER
LOCK
CYLINDER
626P0011