2: BladeManager Installation
2-2 AlterPath BladeManager Manual
Rack Mounting Guidelines
When rack-mounting the BladeManager, consider the following:
Ensure the room temperature is below 35o C (95o F).
If you install the BladeManager in a closed or multi-rack assembly, the
operating ambient temperature of the rack environment may be greater
than the room ambient temperature. Ensure that you install the equipment
in an environment compatible with the manufacturer’s maximum rated
ambient temperature.
Do not block any air vents. Usually, 15 cm (6 in.) of air space provides
proper airflow.
Plan the device installation starting from the bottom of the rack cabinet.
Install the heaviest device in the bottom of the rack cabinet.
Do not extend more than one device out of the rack cabinet at the same
time.
Connect all power cords to properly wired and grounded electrical
outlets.
Maintain reliable earthing of rack mounted equipment by inspecting
supply connections other than direct connections to the branch circuit
such as power strips or extension cords.
Do not overload the power outlet when installing multiple devices in the
rack.
Remove the rack doors and side panels to provide easier access during
installation.
The slide rails in the kit come preset to the correct length for installing in
an IBM rack cabinet and they are adjustable for other rack cabinets.
The slide rails are marked RIGHT/FRONT and LEFT/FRONT for proper
placement on the rack-cabinet flanges.
Ensure that the equipment is mounted or loaded evenly to prevent a
potentially hazardous condition.
Do not place any object weighing more than 50 kg (110 lb) on top of rack-
mounting devices.