2: BladeManager Installation

a.If you plan to transport the rack cabinet to another location with the server installed, remove one screw and loosen the other screws as indicated.

b.Fully extend the rail and re-insert the screw and tighten all screws to secure the rail.

c.If you do not plan to transport the rack cabinet with to another location with the server installed, continue with step 5.

2-6

AlterPath BladeManager Manual

Page 30
Image 30
Cyclades AlterPath BladeManager user manual BladeManager Installation