Desa TPNA-A(-HA), (V)DVF36 Continued, Rough Opening for Installing, Exterior Vent Terminal

Models: TPNA-A(-HA) TPNPEA-A TPNEA-A TSTPA-A TSTA-A(-HA) TSTPEA-A TPNPA-A TSTEA-A (V)DVF36

1 36
Download 36 pages 57.34 Kb
Page 8
Image 8
Figure 9 - Rough Opening for Installing

Pre-Installation

Preparation

Continued

24"

39 3/4"

Min.

43

1

 

/4"

Figure 9 - Rough Opening for Installing

10" Square Min.

Height

Depends On

Installation

Figure 12 - Rough Opening for Installing

Exterior Vent Terminal

See-Thru Fireplace

Vertical

Height

90o Figure 12 - Rough Opening for Installing Elbow

45o

Elbow

2" Dia. Hole

2"

1" Dia. Hol

1"

3"

Exterior Vent Terminal 3"

Depends on

Installation

263/8"

See-Thru Fireplace Horizontal

Length Depends

on Installation

Figure 10 - Hole Locations For Gas Line

and Electric Wires for Peninsula and

See-Thru Fireplaces

Figure 13 - Vent Opening Height

20

3

 

/

 

1

 

6"

1

10

1 / 2"

1 / 2"

" /16 15 11

Figure 11 - Alternate Gas Supply

Location

www.desatech.com56131-F

Page 8
Image 8
Desa TPNA-A(-HA), (V)DVF36, TSTPA-A Continued, Rough Opening for Installing, Exterior Vent Terminal, See-ThruFireplaces