VENT SYSTEM IDENTIFICATION
Installing Vent Components (Figure 28)
Begin the vent system installation by installing the first component, 90° elbow to the starting collars or straight pipe on the top of the appliance, then the straight pipe length and then horizontal or vertical termination kit.
NOTE: All outer connection joints must be sealed with aluminum tape or silicone sealant rated above 300° F/149° C.
The inner flue joints do not require any sealant.
All vent system components lock into place by sliding the concentric pipe section with four (4) equally spaced interior beads onto the appliance collar or previously installed component end with four (4) equally spaced indented sections. When the internal beads of each starting outer pipe line up, rotate pipe section clockwise 90° (approximately 3 inches). The vent pipe is now locked together.
Continue adding components per the
Venting Components
|
| Simpson | ||
| Part Number | Part Number |
| Description |
|
|
|
| |
| 6" Pipe Length | |||
| 9" Pipe Length | |||
| 12" Pipe Length | |||
| 24" Pipe Length | |||
| 36" Pipe Length | |||
| 48" Pipe Length | |||
| Adjustable Pipe Length 11 - 14 5/8" | |||
| Horizontal Square Termination Cap | |||
| Vinyl Siding Standoff | |||
| 45° | Elbow | ||
| 90° | Elbow | ||
| Wall Firestop | |||
| Ceiling Firestop | |||
| Roof Flashing - 0/12 to 6/12 Roof Pitch | |||
| Storm Collar | |||
| High Wind Vertical Top | |||
| 36" Snorkel | |||
| 14" Firestop Snorkel | |||
Figure 28 | Wall Strap | |||
|
|
|
|
Page 18 |