DVS 30-2 Fireplace Component Installation, HEATER BAFFLE IS USED ON DVS-36& DVS-42ONLY

Models: 30-2

1 52
Download 52 pages 39.59 Kb
Page 7
Image 7
FIREPLACE COMPONENT INSTALLATION

FIREPLACE COMPONENT INSTALLATION

Installation of Upper Clearance Spacer for Vertical Vent (Figure 2) Included with every fireplace is the upper clearance spacer. The upper clearance spacer must be attached to the top of the firebox before installation of fireplace in a vertical vent configuration.

1.Remove screw in firebox top that is behind 1/4" flange on vent cover plate and directly in front of adapter pipe.

2.Place the notched portion of upper clearance spacer facing the 1/4" flange on vent cover plate.

3.Flex firebox top and slide upper clearance spacer beneath vent cover plate.

4.Attach upper clearance spacer to firebox top with screw from Step 1.

5.Installation of upper clearance spacer is completed.

The upper clearance spacer will prevent combustible material from contacting adapter pipe.

UPPER

CLEARANCE

SPACER

VENT COVER

ADAPTER PIPE

PLATE

 

Figure 2

Installation of Heater Baffle for DVS-36 or DVS-42 (Figure 3) Your DVS-36 or DVS-42 fireplace is a direct vent gas fireplace. To convert your direct vent gas fireplace into a direct vent gas fireplace heater you will install the heater baffle into the fireplace.

The heater baffle, part number 10993 is included with every DVS-36 or DVS-42.

Attention: For DVS-36/42 only, Propane (LP) gas, on horizontal, straight out rear installation, the heater baffle shall not be used. The DVS-36/42 must remain a decorative appliance.

Installation of heater baffle:

1.Push up and outward to remove top louver.

2.Lower door assembly.

3.Release two door latches at bottom of firebox.

4.Grasp bottom of glass frame, lift glass frame upward in order to release glass frame from lip on top of firebox.

5.Insert heater baffle into interior, top of fireplace. The heater baffle will be installed in front of 5" diameter vent outlet. Align two (2) clearance holes on heater baffle with two (2) screws within interior, top of fireplace. Remove two (2) screws from fireplace.

6.Attach heater baffle to interior, top of fireplace with two (2) screws from Step 5.

7.Align and place top of glass frame over lip on top of firebox.

8.Grasp bottom of glass frame, push inward and place glass frame onto firebox.

9.Attach two door latches onto bottom of glass frame.

10.Align and insert (4) mounting tabs on top louver with (4) slots on casing top. Push downward to lock the top louver into position.

11.Installation of heater baffle is completed.

13369-1-0203

HEATER BAFFLE

HEATER BAFFLE IS USED ON DVS-36 & DVS-42 ONLY

Figure 3

Reversible Vertical or Horizontal Adapter Pipe (Figure 4)

This fireplace has a reversible adapter pipe. The adapter pipe is installed in the vertical position at the factory. Use the following steps to change the adapter pipe from the vertical position to the horizontal position.

1.Remove screws from vent cover.

2.Lift upward to remove vent cover from adapter pipe.

3.Grasp adapter pipe and rotate adapter pipe clockwise to the horizontal position.

4.Replace vent cover over adapter pipe. Attach vent cover with screws from Step 1.

5.Repositioning of the adapter pipe is completed.

Adapter Pipe Vertical Outlet

VENT COVER

Adapter Pipe Horizontal Outlet

HEATER BAFFLE IS USED ON DVS-36 & DVS-42 ONLYVENT COVER

Figure 4

TOP STANDOFFS REMOVED FOR CLARITY

Page 7

Page 7
Image 7
DVS 30-2 Fireplace Component Installation, HEATER BAFFLE IS USED ON DVS-36& DVS-42ONLY, Adapter Pipe Vertical Outlet