2

Installation

This chapter provides the instructions to install the G3G124‐24, G3G124‐24P and G3G170‐24. Unless otherwise noted, the instructions apply to all switches.

Equipment needed:

Phillips screwdriver

Flat blade screwdriver

Electrical Hazard: Only qualified personnel should install or service this unit.

Riesgo Eléctrico: Nada mas personal capacitado debe de instalar o darle servicio a esta unida.

Elektrischer Gefahrenhinweis: Installationen oder Servicearbeiten sollten nur durch ausgebildetes und qualifiziertes Personal vorgenommen werden.

Follow the order of the sections below for correct installation.

For information about...

Refer to page...

 

 

Unpacking the G-Series Switch

2-2

 

 

Order of Installation Steps

2-3

 

 

Mounting the Switch

2-3

 

 

Power Supply Installation Considerations

2-5

 

 

Installing a Power Supply

2-8

 

 

Installing and Removing an IOM

2-10

 

 

Connecting Power to the Switch

2-13

 

 

Connecting to the Console Port

2-14

 

 

Connecting to the Network

2-16

 

 

Completing the Installation

2-22

 

 

Installing an Optional PoE Module in the G3G124-24 Switch

2-23

 

 

Enterasys G-Series Hardware Installation Guide 2-1

Page 27
Image 27
Enterasys Networks G3G124P-24, G3G170-24, G3G124-24 manual Installation