Installing and Removing an IOM
Installing and Removing an IOM
Caution: There are hazardous moving parts inside the base unit. Keep fingers and other body parts away from spinning fans when installing or removing IO modules.
Precaución: El interior de la unidad que sirve de base contiene partes móviles peligrosas. Mantenga los dedos y cualquier otra parte del cuerpo lejos de las aspas de los ventiladores cuando realice la instalación o al retirar los módulos IO.
Installing an Optional PoE Module on the G3G-24TX IOM
Notes: Instructions in this section do not fully describe installing PoE on the
The instructions below apply only to the
If you have purchased an optional PoE card (G3G‐POE), you can install it before installing the G3G‐24TX IOM into the G‐Series base system chassis. You can also install it at any time by first removing the IOM as described in “Removing an IOM” on page 2‐13.
The G‐Series PoE card and IOM are shipped in separate packages. Unpack and install the PoE card in the IOM as follows:
1.With an ESD strap attached to your wrist, open the box and remove the packing material protecting the PoE module.
2.Perform a visual inspection of the PoE module for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page xvii for details.
Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive electronic equipment.
Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precauciones de seguridad para evitar descargas de electricidad estática.
3.Gently plug the PoE module into the IOM by fitting the standoffs into the PoE board mounting holes as shown in Figure 2‐3. There should be a direct vertical translation of standoffs to PoE mounting holes.