Foundry Networks LS 648 manual 2 Summary of Installation Tasks, Where to Find More Information

Models: LS 648 LS 624

1 76
Download 76 pages 55.7 Kb
Page 19
Image 19
Summary of Installation Tasks

Installing a FastIron LS Switch

Summary of Installation Tasks

Follow the steps listed below to install your FastIron LS. Details for each of these steps are provided in this chapter and in the following chapter.

Table 3.2: Summary of Installation Tasks

Task

Task

Where to Find More Information

Number

 

 

 

 

 

1

Ensure that the physical environment that will host the

“Preparing the Installation Site” on page 3-5

 

device has the proper cabling and ventilation.

 

 

 

 

2

Install any required optional modules into the switch.

“Installing an Optional Module into the

 

 

Switch” on page 3-14

 

 

 

2

Install the Foundry device on a desktop, in an

“Installing the Device” on page 3-5

 

equipment rack, or on the wall.

 

 

 

 

3

Once the device is physically installed, plug the device

“Powering On the System” on page 3-16

 

into a nearby power source that adheres to the

 

 

regulatory requirements outlined in this manual.

 

 

 

 

4

Verify that the system LEDs are registering the proper

“Verifying Proper Operation” on page 3-16

 

LED state after power-on of the system.

 

 

 

 

5

Attach a terminal or PC to the Foundry device. This will

“Attaching a PC or Terminal” on page 3-16

 

enable you to configure the device via the Command

 

 

Line Interface (CLI).

 

 

 

 

6

No default password is assigned to the CLI. For

“Assigning Permanent Passwords” on

 

additional access security, assign a password.

page 4-1

 

 

 

7

Before attaching equipment to the device, you need to

“Configuring IP Addresses” on page 4-3

 

configure an interface IP address to the subnet on

 

 

which it will be located. Initial IP address configuration

 

 

is performed using the CLI with a direct serial

 

 

connection. Subsequent IP address configuration can

 

 

be performed using the Web management interface.

 

 

 

 

8

Once you power on the device and assign IP

“Connecting Network Devices” on page 4-4

 

addresses, the system is ready to accept network

 

 

equipment.

 

 

 

 

9

Test IP connectivity to other devices by pinging them

“Testing Connectivity” on page 4-6

 

and tracing routes.

 

 

 

 

10

Continue configuring the device using the CLI or the

Foundry FastIron Configuration Guide

 

Web management interface. You also can use IronView

 

 

Network Manager to manage the device. See the

 

 

Foundry IronView Network Management User’s Guide

 

 

for information.

 

 

 

 

11

Secure access to the device.

Foundry FastIron Configuration Guide

 

 

 

September 2007

© 2007 Foundry Networks, Inc.

3 - 3

Page 19
Image 19
Foundry Networks LS 648 2 Summary of Installation Tasks, Where to Find More Information, Number, Line Interface CLI