
Installing a FastIron LS Switch
5.Check the LEDs on the RPS to ensure proper operation. On the
| FLS units |
RPS input port |
|
| RPS Unit |
| RPS output port |
AC Power | AC Power |
Supply No.1 | Supply No.2 |
NOTE: For International use, you may need to change the AC line cord. You must use a line cord set that has been approved for the receptacle type in your country.
September 2007 | © 2007 Foundry Networks, Inc. | 3 - 13 |