FGS Release
Foundry FastIron LS Layer 2 Compact Switch
Hardware Installation Guide
FastIron LS FastIron LS
Copyright 2007 Foundry Networks, Inc. All rights reserved
CHAPTER
INSTALLING A FASTIRON LS SWITCH
ABOUT THIS GUIDE
PRODUCT OVERVIEW
C ONNECTING N ETWORK D EVICES AND
C HECKING C ONNECTIVITY
M AINTAINING THE F AST I RON LS H ARDWARE
C HAPTER
CHAPTER
APPENDIX A
HARDWARE SPECIFICATIONS
CHAPTER
W ARNINGS
C AUTIONS AND W ARNINGS
A PPENDIX B
C AUTIONS
Audience
Chapter About This Guide
Introduction
What’s Included in This Edition?
Email Access
How to Get Help
Warranty Coverage
Web Access
Table 2.1 Chapter Contents
Hardware Features
Chapter Product Overview
FLS624, FLS648
FastIron LS Network Interfaces
Control Features
Reset Button
Serial Management Interface Console Port
Interface
Network Interfaces
FastIron LS 10/100/1000BASE-T Ports
Table 2.2 Network Interfaces
10-GbE CX4 Module
10 Gigabit Ethernet Module Slots
Cable Specifications for New Module
10 Gbps CX4 Ports
Condition
Port, System and Module Status LEDs
CX4 Transceiver Infiniband cable
Table 2.3 Port Status LEDs
System LEDs
Table 2.4 Status LEDs
Condition
Status
Fiber Optic Modules
Power Supplies
Optional Redundant Power Supply
Power Supply Receptacles
September
2007 Foundry Networks, Inc
Description
Chapter Installing a FastIron LS Switch
Unpacking a System
Table 3.1 Chapter Contents
General Requirements
Package Contents
Foundry FastIron Configuration Guide
Summary of Installation Tasks
Table 3.2 Summary of Installation Tasks
Where to Find More Information
Power Precautions
Installation Precautions
General Precautions
Lifting Precautions
Cabling Infrastructure
Preparing the Installation Site
Installation Location
Installing the Device
Desktop Installation
Rack Mount Installation
Figure 3.1 Attaching the adhesive feet
Wall Mount Installation
Figure 3.3 Installing the device in a rack
Figure 3.2 Attaching the brackets
Package Contents
Installing a Redundant Power Supply
About the RPS2-EIF Redundant Power Supply
Features and Benefits
FastIron RPS2-EIF
LEDs
Port Indicators
System Indicators
Mounting
Installing a FastIron LS Redundant Power Supply
Equipment Checklist
Installation
Desktop or Shelf Mounting
Figure 3.6 Installing the RPS in a Rack
Figure 3.5 Attaching the brackets
FastIron LS648
Connecting Switches to the RPS
FLS units
GND N.C
Installing an Optional Module into the Switch
Ports Pin-Out RPS2-EIF
GND N.C RPS Present Status Status Power Good GND
Figure 3.10 Inserting an SFP transceiver into a slot
Installing an SFP Transceiver
Powering On the System
Verifying Proper Operation
Attaching a PC or Terminal
Null Modem
Wiring Map for Serial Cable
Table 3.3 Serial Cable Wiring
Switch’s 9-Pin
September
2007 Foundry Networks, Inc
Step
Chapter Connecting Network Devices and Checking Connectivity
Assigning Permanent Passwords
Table 4.1 Network Connectivity Tasks
FLS648 Switchconfig# enable super-user-password text
Recovering from a Lost Password
FLS648 Switch enable
FLS648 Switch# configure terminal FLS648 Switchconfig#
Devices Running Layer 2 Software
Configuring IP Addresses
Connecting to Ethernet or Fast Ethernet Hubs
Connecting Network Devices
Connectors
Cable Specifications
Automatic MDI/MDIX Detection
Connecting to Workstations, Servers, or Routers
Connecting a Network Device to a Fiber Port
Installing a Fiber Optic Module
Cabling a Fiber Optic Module
Testing Connectivity
Cleaning the Fiber-Optic Connectors
Observing LEDs
Meaning
Troubleshooting Network Connections
Table 4.2 Network Connection-Related LED States
Desired
Foundry FastIron LS Layer 2 Compact Switch Hardware Installation Guide
Table 5.1 Chapter Contents
Managing FastIron LS Temperature Settings
Using the Temperature Sensor on the FastIron LS
Chapter Maintaining the FastIron LS Hardware
Power supply 2 NA - AC - Regular present, status ok Fan 1 failed
Displaying the Temperature on the FastIron LS
Displaying Syslog Messages for Temperature on the FastIron LS
FLS648 Switch show chassis Power supply 1 not present
FLS648 Switch# show log
Displaying Management Module CPU Usage
Hardware Maintenance Schedule
Installing or Replacing a 10-Gigabit Ethernet Module
Changing the Temperature Polling Interval
Installing an Optional Module into the Switch
Replacing a Fiber Optic Module
Removing a 10-Gigabit Ethernet Module
Installing a New Fiber Optic Module
Removing a Fiber Optic Module
Bail Latch
Cleaning the Fiber-Optic Connectors
Cabling a Fiber Optic Module
Digital Optical Monitoring
Description
Supported Media
Table 5.2 Status Value Description
Status Value
CLI Commands
no optical-monitor alarm interval
show optic port/slotnumber
September
2007 Foundry Networks, Inc
Symptom
Chapter Troubleshooting
Diagnosing Switch Indicators
Table 0.1 Troubleshooting Chart
Power and Cooling Problems
Installation
In-Band Access
Redundant Power supply specifications
Chapter Hardware Specifications
Table 0.2 Chapter Contents
FastIron LS specifications
Operating Environment
FastIron LS Specifications
Physical Dimensions
Environmental Considerations
Storage Temperature
Cooling
Storage Environment
Mean Time Before Failure
Fan Speed
Table 0.9 Fan Noise Levels for FastIron LS 24-Port Switch
Table 0.10 Fan Noise Levels for FastIron LS 48-Port Switch
Chassis side
Table 0.11 Regulatory Compliance and Safety Approvals Certifications
Regulatory Compliance
FCC CFR 47 Part 15 Warning
CISPR 22 CLASS A Warning
Serial Console Port Pinouts
Warranty
Pinouts and Signaling
VCCI
Table 0.12 Cable length summary table
Cable Specifications
Connector Type
LC connector for
Core
Connector Type
Table 0.12 Cable length summary table Continued
Cable Type
Table 0.13 Specifications for AC Power
AC Power Supply
Specifications
Connector Type
Physical Dimensions and Weight
Redundant Power Supply Specifications
Power Cords
Key features
Power Supply
Input Connector
Electromagnetic Compatibility EMC and Immunity Standards
Table 0.15 Input Connector for Power Supplies
Table 0.17 Safety Warning Labels on Power Supplies
Safety Agency Approvals and Certifications
Safety Warnings
Environmental Considerations
Temperature
Electrical Specifications
Input specifications
Table 0.18 Environmental Considerations for Power Supplies
September
2007 Foundry Networks, Inc
Europe and Australia
Appendix A Regulatory Statements
U.S.A
Industry Canada Statement
September
2007 Foundry Networks, Inc
Cautions
Appendix B Cautions and Warnings
Foundry FastIron LS Layer 2 Compact Switch Hardware Installation Guide
Cautions and Warnings CAUTION Never leave tools inside the device
Warnings
Page
Foundry FastIron LS Layer 2 Compact Switch Hardware Installation Guide