3.7 SYSTEM INSTALLATION INSTRUCTIONS (CONT.)
6.With the cabinets together, carefully slide the drainpipe halfway into the rubber boot. Connect the
7.Insert bolts and install nuts loosely (Fig. 5, arrows). Do not tighten bolts at this time.
8.When the two cabinets are properly aligned, tighten the cabinet connection nuts and bolts at the front and back. At the fryer front:
The bolts are located at the bottom front of the connecting wall of the fryer and at the control box. At the fryer back: The bolts are located at the just inside the cabinet near the cabinet connection holes, and at the top inside the connecting wall of the flue box.
9.Reinstall back panels removed at the beginning of system assembly. Ensure panels are properly aligned, then install and tighten the screws. Install the joiner strip where fryer cabinets are connected.
10.Connect the
Figure 4. Connect flexlines and align cabinet connection holes.