Frymaster YSCFC24 SERIES FLATBOTTOM GAS FRYERS, Pre-Installation, 2.1GENERAL, 2.2CLEARANCES

Models: YSCFC24

1 40
Download 40 pages 54.68 Kb
Page 9
Image 9
YSCFC24 SERIES FLATBOTTOM GAS FRYERS

YSCFC24 SERIES FLATBOTTOM GAS FRYERS

CHAPTER 2: PRE-INSTALLATION

2.1GENERAL

A.Installation of any gas-fired equipment should be performed by qualified personnel.

B.A manual gas shut-off valve must be installed in the gas supply line between the appliance(s) and the main gas supply for safety and ease of future service.

2.2CLEARANCES

The appliance area must be kept clear of all combustibles. Each unit is design-certified for the following installations:

1.Commercial use only (not for household use).

2.For installation on a combustible floor when equipped with the factory supplied 5" casters (6" work height).

3.Areas with a minimum clearance of 6" side, 6" rear and 6" from the floor for combustible construction. YSCFC24 Series flatbottom gas fryers must be installed with the casters provided. Locking casters should be installed on the front (cook side) of the fryer.

2.3 STANDARDS

Installation must be accomplished in accordance with all applicable state and local codes, with special attention to the following standards:

A.The fryer and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at pressures in excess of 1/2 PSI.

B.The fryer must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system as pressures equal to or less than 1/2 PSI.

C.National Fuel Gas Code

ANSI Z-223.1-1988 (or latest edition) American Gas Association

1515 Wilson Boulevard Arlington, VA 22209

D.National Electrical Code

ANSI/NFPA #70-1984 (or latest edition) American National Standards Institute 1430 Broadway

New York, NY 10018

2-1

Page 9
Image 9
Frymaster operation manual YSCFC24 SERIES FLATBOTTOM GAS FRYERS, Pre-Installation, 2.1GENERAL, 2.2CLEARANCES, Standards