4.4.6.1TEST UNIT READY command: COMMAND phase (initiator target)

The TEST UNIT READY command checks whether a logical unit is ready. The command does not request. The acknowledgment of this command reported using the status and sense data.

The CDB of this command is shown in the following illustration.

Byte 0

1

2

3

4

5

7

6

5

4

3

2

1

0

 

 

 

Operation code X'00'

 

 

 

 

 

 

 

 

 

 

 

 

Logical unit number

 

 

 

(Reserved)

 

 

 

 

 

 

 

 

 

 

(Reserved)

Control byte

4.4.6.2Acknowledgment

This scanner reports the acknowledgment of the TEST UNIT READY command as follows:

(a)When ready:

Status: B'00000' (GOOD)

Sense key: X'0' (NO SENSE)

(0)When not ready:

Status: B'0000l' (CHECK CONDITION)

Sense key: X'2' (NOT READY)

4-32

Page 60
Image 60
Fujitsu 600C manual Test Unit Ready command Command phase initiator → target, Acknowledgment