Garland MP-GD-10-S, MP-GS service manual Stacking Two Ovens, Item Description

Models: MP-GS MP-GD-10-S

1 80
Download 80 pages 53.4 Kb
Page 10
Image 10

PREPARING THE OVEN FOR INSTALLATION

Stacking Two Ovens

1.Follow the instructions in the section entitled, “Legs and Casters,” on page 5.. Then resume at step 2 on this page to complete the stacking process..

2.Move the lower oven as close to the final installation point as possible, leaving enough space around the oven to allow access for the remaining installation steps.. If casters have been installed, apply the brakes on the two front wheels..

3.Carefully raise the upper oven and place it on top of the lower oven, aligning the four lower corners of the upper even to the four upper corners of the lower oven..

4.At the rear of the stacked ovens, install the stacking bracket using six 1/4-20 x 1” hex head bolts with lock washers and nuts.. Firmly tighten all six nuts/bolts to secure the ovens together..

5.Remove the outer flue vent from the right top corner of the rear of each oven, saving the screws..

6.If they are not already fastened together, assemble the two parts of the interconnecting flue channel included in the stacking kit, using six #10 x 3/4” sheet metal screws..

7.Fit the channel assembly over the flue vent area of each oven and fasten using the screws removed in step 5..

8.If you have installed casters, be sure to install the restraint bracket on the lower left corner of the rear of the upper oven using two #10 x3/4” sheet metal screws..

9.If your installation requires one common gas inlet for both ovens, use the piping included with your stacking kit to assemble the interconnecting gas pipe.. Refer to Figure 3..

NOTE: It is recommended, when stacking a Moisture + Oven with a Master Convention Oven, that the Moisture + be located on the bottom..

 

 

 

Item Reference Key For Figure 3

 

 

 

Item

Item Description

 

 

 

No..

 

 

 

 

 

 

 

1

MSCR-HH STL 1/4-20x3/4

 

 

 

2

LKSHR-SPL 1/4x1/2x1/6

 

7

 

3

Nut - Hex 1/4-20 STL ZP

 

 

4

Bell Reducer 1” x 3/4”

 

 

 

 

 

 

5

3/4 Tee NPT

 

 

 

7

Flue Assembly – Double Stack

 

 

 

8

Pipe Union 3/4 NPT

9

3

 

10

Close Nipple 3/4 x 1

 

 

 

2

 

11

Pipe 3/4 x 20-1/2”

13

 

1

12

3/4 x 3-1/2 Nipple

 

14

13

Bell Reducer

11

 

8

 

 

14

Stacking Bracket Rear

 

 

 

 

5

12

12

4

 

13

9

Figure 3..

Page 10

Part # MPSM07 (03/24/08)

Page 10
Image 10
Garland MP-GD-10-S, MP-GS service manual Stacking Two Ovens, Item Description