6. ACCEPTANCE TESTS
6.10. RELAY MEASUREMENT TESTS
6.10.1. CURRENT MEASUREMENT
1.Change setpoint GENERAL/FUNCTION PERMIT/50BF 1P FUNCTION to PER.
2.Change setpoint GENERAL/FUNCTION PERMIT/50BF 3P FUNCTION to NO PER.
3.Change setpoint GENERAL/FUNCTION PERMIT/3P No INT FUNCT to NO PER.
4.Change setpoint TABLE 1/50BF SETTINGS/PH LOSET PICKUP to 5A (1A in relays with 1A nominal current).
5.Change setpoint TABLE 1/50BF SETTINGS/1 PHASE TIMER T1 to 0.050s.
6.Change setpoint TABLE 1/50BF SETTINGS/Nº OUTPUT STAGES to 1.
7.Energize digital input 3POLE BF INITIATE (terminals
8.Increase current applied on
9.Repeat step 8 applying current on
PHASE B BF INITIATE.
10.Repeat step 8 applying current on
PHASE C BF INITIATE.
6.10.2. TIMING MEASUREMENT
1.Connect the stop input of the precision timer to the
2.Apply the operating current level of the previous test to terminals
3.Simultaneously energize the digital input 3POLE BF INITIATE and the starting input of the precision timer.
4.After 1 PHASE TIMER T1 (0.050s) the relay will trip.
5.Verify that the actual operating time is equal to 1 PHASE TIMER T1 (accuracy ± 5% or 30 ms, whichever is greater).
DBF Breaker Failure Protection | 37 |