7.1. INSTALLATION
The relay should be installed in a clean, dry and
The DBF system is supplied in a 19’’ rack case 2 units high. Figure 5 shows the dimension diagram.
The relay should be mounted on a vertical surface. Figure 6 shows a diagram for panel drilling.
Given that the design of the DBF unit is based on high performance digital technology it is not necessary to calibrate the relay. However if the tests show that it is necessary to readjust the relay, it is recommended to return the unit to the factory to check it.
7.2. CONNECTION-TO-GROUND AND DISTURBANCES SUPPRESSION
The terminal (see Figure 2) should be connected to ground so that the disturbance suppression circuits in the system works correctly. This connection should be as short as possible (preferably 25 cm or less) to guarantee maximum protection. In this way the capacitors that are internally connected between the inputs and ground divert high frequency disturbances directly to ground without passing through the electronic circuits. Then the internal circuitry is perfectly protected.
In addition this connection also guarantees the physical safety of the personnel when handling the relay, since the whole casing is connected to ground.
7.3. MAINTENANCE
Given the important role that the protection relays play in the operation of any installation, a periodic program of tests is highly recommended. The unit incorporates
The set of tests which can be performed to test that all aspects of the DBF unit function properly is described in detail in the chapter entitled ACCEPTANCE TESTS.