g
TSTAMP Q4
6028773 1
FREQ RANGE: 2%
NO LOAD : 1
QUICK BATTERY TEST PRESS ENTER
CALIBRATE BAT PRESS DOWN+ENTER
PF1 THYRISTOR 1 BATT.THYRISTOR 0
VSS THYRISTOR 0 PF1. CONVERTER 1
BAT CHARGER | 2 |
INVERTER | 1 |
|
|
LAST TEST TIME 0:00:00
FORCE BYPASS press DOWN+ENTER
AUTOMATIC BYPASS
ENABLED
BATTERY 7Ah BAT. CHARGE 86%
PLL LOCK SPEED
NORMAL
ECO DISABLED ENTER/RESET CHNG
AUTO RESTART ON ENTER/RESET CHNG
Digital Energy™ LP Series
Service information on internal timer.
Frequency tracking range: output converter frequency will follow the bypass frequency within these limits before returning to its own internal frequency. Standard setting: nominal ±2%. Can be changed into nominal ±4% or ±6%. See 5.3.4
Default setting = 1 (active). For disabling this feature see 5.3.4.
Start of the manual Quick Battery Test.
See for more information section 5.4.2 'Quick Battery Test'
Start of the manual Deep Battery Calibration Test.
See for more information sections 5.4.3 'Deep Battery Calibration Test'
Service information on internal UPS components
Service information on internal UPS components
Service information on internal UPS components
Batt.Charger: 0 = off, 1 = float charging; 2 = top charge, 3 = boost charging, 4 = maintenance charge
Duration of latest test performed, hh/mm/ss
The UPS transfers the load to bypass when the keys 'down' (2) and 'Enter/Reset' (3) on the front panel are depressed simultaneously for approx. 1 second. If the bypass supply is not within limits, the lower line will show the text 'UNAVAILABLE'.
Service
Service
Service
Service
Service
LX: OPM_LPU_11U_5K0_10K_1US_V030 | 29 | GE DE LP 11U UPS: Installation / User Manual 3.0 (US) |