14.Insert the RF Board (103) into the new right meter half (18). See FIG. 35.
Ensure that the RF Board (103) is positioned securely in the slots (A) of the new right meter half (18). See FIG. 35.
101 A
103
FIG. 35
15.Slide the trigger assembly (13, 14, 22, 23, 36, & 37) back onto the mounting peg on the right half of the meter (18). See FIG. 36.
Ensure that the circular trigger plunger (23) is cen- tered with the trigger switch. Also ensure that the trigger spring (37) is securely slid into position. See FIG. 36.
37 23
ti4323
FIG. 36
16.Make sure that all other meter parts are positioned securely and in the correct location. See FIG. 37.
FIG. 37
17. Attach the bezel (31) to the right meter housing (18).
Ensure that all meter parts are positioned securely and in the correct location. Ensure that all cables are routed correctly throughout the meter and will not be pinched or kinked when the halves are reas- sembled See FIG. 38 and FIG. 39.