Mounting Resaw to
the Floor
We recommend that you bolt your new resaw to the floor. Because this is optional and floor mate- rials may vary, floor mounting hardware is not included. It may be necessary to level the floor before installing this machine.
Tools Needed | Qty |
Hammer Drill | 1 |
Punch 1⁄2" | 1 |
Hammer drill bit 1⁄2" x 6" | 1 |
Hammer | 1 |
Air Compressor | 1 |
Vacuum | 1 |
Hardware Needed | Qty |
Lag Shields 5⁄16" x 3" | 6 |
Lag Bolts 5⁄16" x 4" | 6 |
Flat Washer 5⁄16" | 6 |
To mount the resaw machine to the floor:
1.Put on safety glasses and a dust mask before starting!
2.Use the mounting holes in the resaw stand feet to act as a guide for drilling into your floor, and drill approximately 31⁄2" deep into the concrete floor.
3.Using compressed air and a vacuum, remove the concrete dust from the newly drilled holes.
4.Using the hammer and punch, pound the lag shields into the concrete below the stand feet and flush with the surface of the concrete.
5.Secure the resaw to the floor with the lag bolts and washers.
Mounting the |
|
Conveyor Belt |
|
Tools Needed | Qty |
Wrench/Socket 17mm | 1 |
Hardware Needed | Qty |
Carriage Bolt | 6 |
Flat Washer 10mm | 6 |
Lock Nut | 6 |
To install the conveyor belt onto the resaw:
1.Remove the lag bolts that secure the con- veyor belt assembly to the crate pallet.
2.Remove the blade guide (shown in the upper half of Figure 8) from the wheel housing.
Figure 8. Conveyor belt placement.
The conveyor belt is very heavy. Seek assistance or use power equipment to mount the conveyor belt.
3.Lift the conveyor belt onto the resaw body as shown in the lower half of Figure 8.
Model G0503 (Mfg. Since 12/08)