Haier KC18AGH 10.2Refrigerant Tubing, Install Outdoor Unit, Installation Service, edge is smooth

Models: KC18AGH SAP-K18AM

1 37
Download 37 pages 20.85 Kb
Page 31
Image 31
10.2Refrigerant Tubing

Installation Service

10.INSTALL OUTDOOR UNIT

10.2Refrigerant Tubing

10.2.1 Use of The Flaring Method

Many of the conventional split system air conditioners employ the flaring method to connect refrigerant tubes which run between indoor and outdoor units. In this method, the copper tubes are flared at each end and connected with flares nuts.

10.2.2Flaring Procedure With A Flare Tool

Cut the copper tube to the required length with a tube cutter. It is recommended to cut approx. 30 - 50 cm longer than the tubing length you estimate.

Remove burrs at the end of the copper tube with a reamer or file. This procedure is important and should be done carefully to make a good flare. (Fig.25)

NOTE When reaming, hold the tube end downward and be sure that no copper scraps fall into the tube. (Fig.26)

Remove the flare nut from the unit and be sure to mount it on the copper tube.

Make a flare at the end of copper tube with a flare tool.* (Fig.27)

(*Use "GRID" or equivalent.)

NOTE A good flare should have the following charactcteristics:

-inside surface is glossy and smooth.
-edge is smooth.
-tapered sides are of uniform length.
10.2.3Caution Before Connecting Tubes Tightly

Be sure to apply a sealing cap or water- proof tape to prevent dust or water from getting into the tubes before they are used.

Be sure to apply refrigerant lubricant to the matching surfaces of the flare and union before connecting them together. This is effective for reducing gas leaks. (Fig.28)

For proper connection, align the union tube and flare tube straight with each other, then screw in the flare nut lightly at first to obtain a smooth match. (Fig.29)

Deburring
BeforeAfter

Fig.25

Copper tubing

Reamer

Fig.26

Flare nut

Copper tubing

Flare tool

Fig.27

Apply refrigerant

Iubricant here and here

Fig.28

Union Flare nut

Fig.29

29

Page 31
Image 31
Haier KC18AGH 10.2Refrigerant Tubing, Install Outdoor Unit, Installation Service, Use of The Flaring Method, Deburring