FLUEING WITH THREE (3) 90° ELBOWS

 

 

V (FT.)

H (FT.)

 

H + H1 (FT.)

 

 

1´ MIN. (0.30M)

1´ MAX. (0.30M)

 

3´ MAX. (0.91M)

 

 

2´ MIN. (0.61M)

2´ MAX. (0.61M)

 

5´ MAX. (1.52M)

 

 

3´ MIN. (0.91M)

4´ MAX. (1.22M)

 

8´ MAX. (2.44M)

 

 

4´ MIN. (1.22M)

6´ MAX. (1.83M)

 

12´ MAX. (3.66M)

 

 

 

H = 6´ MAX. (1.83M)

H+H1

= 12´ MAX. (3.66M)

 

 

NOTE: V + V, + H + H1 = 33’ (10.06M) MAX.

V1

 

 

 

 

 

 

 

 

V

 

 

 

 

 

H

 

 

 

 

H1

 

 

 

 

 

USE DVP-SERIES

 

 

 

 

COMPONENTS ONLY.

 

 

H2

 

 

 

 

 

 

 

 

 

 

V

 

 

 

H1

 

 

FLUEING WITH THREE (3) 90° ELBOWS

 

 

 

V (FT.)

H (FT.)

H + H1 + H2 (FT.)

 

 

 

1´ MIN. (0.30M)

1´ MAX. (0.30M)

2´ MAX. (0.61M)

 

 

 

2´ MIN. (0.61M)

2´ MAX. (0.61M)

4´ MAX. (1.22M)

 

 

 

3´ MIN. (0.91M)

3´ MAX. (0.91M)

8´ MAX. (2.44M)

 

 

 

4´ MIN. (1.22M)

4´ MAX. (1.22M))

10´ MAX. (3.05M)

 

 

H

V+H+H1+H2 = 30´MAX.(9.14M)

H=4´MAX.(1.22M)

H+H1+H2 =10´MAX.(3.05M)

 

 

 

Figure 16.

 

 

 

 

 

16

Heat & Glo • SL-550TRSI-AUE2079-902 Rev. B • 7/06

 

 

Page 16
Image 16
Hearth and Home Technologies SL-550TRSI-AUE manual Flueing with Three 3 90 Elbows