ASSEMBLY STEP 4

INTRODUCTION

ORANGE HARDWARE BAG CONTENTS :

SCREW (K) 30 mm Qty: 4

AOpen ORANGE HARDWARE BAG.

BAttach HAND RAIL BASE COVER to the base frame using

2 SCREWS (K).

IMPORTANT PRECAUTIONS

HAND RAIL TRANSITION PIECE

HAND RAIL BASE COVER

SCREW (K)

CSlide HAND RAIL TRANSITION PIECE and HANDLEBAR into

CONSOLE.

CRepeat on other side.

DBe sure all bolts and screws are tightened and secured on the treadmill.

ASSEMBLY

BEFORE YOU BEGIN

TREADMILL OPERATION

TROUBLESHOOTING CONDITIONING & MAINTENANCE GUIDELINES

YOU’RE FINISHED!

11

LIMITED WARRANTY

Page 11
Image 11
Horizon Fitness T4, T6 manual YOU’RE Finished, Open Orange Hardware BAG, Screws K, Console