HotBrick Network Solutions

For each PC connected to the LAN ports, the corresponding LAN LED (either 10 or 100) should be ON.

3.Configuring the HotBrick Load Balancer LB-2 for Internet Access

Select Primary Setup from the menu, to see a screen like the example below.

Configure WAN 1 and/or WAN 2 as required.

For any of the following situations, refer to Chapter 3: Advanced Port Setup for any further configuration, which may be required.

Using both ports

Multiple IP addresses on either port

Multiple PPPoE sessions

PPTP connection method

Figure 8: Primary Setup Screen LB-2

13

Page 17
Image 17
HotBrick manual Primary Setup Screen LB-2