Chapter 1, Getting Started

Step 1: Make Connections

Step 1: Make Connections

 

Make the connections between the elements of the Test System and the base

 

station as shown in figure 2.

 

 

NOTE:

This figure does not illustrate all rear-panel connections between the Cellular Adapter and

 

Test Set. Refer to the Cellular Adapter User’s Guide to verify these connections.

 

 

￿

CDMA Base Station

￿

Even-Second

Clock

19.6608 MHz Clk (or other reference)

SYNTH REF IN

10 MHz OUT

HP - IB

REF IN

EVEN SECOND/

SYNC IN

Note:

This figure shows the most common timebase configuration. See "An Alternative Test-System-to-BaseStation Timebase Configuration" on page 60.

10 MHz REF INPUT

10 MHz REF OUTPUT

Figure 2

14