Installing

Installing and initially configuring the switch

Installing a 2/8q FC Switch involves the following steps, each of which is discussed in the following sections:

Unpack the switch and verify carton contents, page 28

Mount the switch, page 29

Install SFP transceivers, page 34

Connect the cables, page 35

Configure the switch, page 36

Unpack the switch and verify carton contents

The 2/8q FC Switch is shipped with the components shown in Figure 5.

2

1

3

4

7

6

5

12/8q FC Switch

22/8q FC Switch Quick Start Installation Instructions (printed)

3Power cable (approved for use in the United States)

4Mounting adapter brackets

5Screws for the mounting adapter brackets (6)

6Rubber feet (4)

7Small Form Factor Pluggable (SFP) transceivers (4)

Figure 5: Switch carton contents

28

HP StorageWorks 2/8q Fibre Channel Switch Installation Guide

Page 28
Image 28
HP A7540-96010 manual Installing and initially configuring the switch, Unpack the switch and verify carton contents