Single Chilled Water installation diagram

Callout

Component

 

 

1

Chilled Water Energy Base Station

2

Water supply line to the CRAH/CRAC

3

Water return line from the CRAH/CRAC

4

Water supply temperature sensor probe

5

Upstream flow meter

6

Water return temperature sensor probe

7

Downstream flow meter

Configuring the Chilled Water Base Station

NOTE: You must have the ULTRALINKsoftware installed on the PC that is configuring the base station. You can download the software from the Dynasonics website (http://www.dynasonics.com/downloads.php).

(Optional) Sensor Base Stations 38