
1.Choose the location for the Energy Base Station, relative to your energy meter.
2.Connect the Energy Base Station to your energy meter.
a.Strip the plastic coating from the ends of the two wires on the Energy Base Station wire harness.
b.Open the energy meter.
c.Using a small screwdriver, loosen the 1K and COM terminals.
d.Insert the end of the red wire into the 1K terminal.
e.Insert the end of the black wire into the COM terminal.
f.Using a small screwdriver, tighten the 1K and COM terminals.
g.Insert the connector from the Energy Base Station wire harness into the Energy Base Station.
Callout | Component | Description | |
|
|
| |
1 | Energy meter | Meter wiring terminal blocks | |
2 | (+ terminal) | Insert the red wire from the wire harness. | |
3 | (- terminal) | Insert the black wire from the wire harness. | |
4 | (ground/shield) | Insert the silver wire from the wire harness. | |
5 | Installed on the last meter of a | ||
| resistor |
|
|
6 | Connects the ION meter to the Modbus base station | ||
7 | Modbus base station | Communicates data from the energy meter to the Edge server via | |
|
|
| Ethernet |
3.Using an
4.Using an Ethernet cable, connect the Modbus base station to the Edge server network. Verify that the pins of the adapter are connected in the correct orientation:
o
(Optional) Sensor Base Stations 55