Power up procedure
Powering up the components
1.Verify that the gateway is connected to the power and is working in operation mode by viewing the gateway LED status (on page 18).
o
NOTE: The gateway must be active before powering up the base stations.
2.Using a small flathead screwdriver or the power switch toggle, turn on the base stations.
3.Verify that all base stations have connected to the gateway by viewing the base station LED status. This process might take up to 5 minutes.
o
o Not
Base station LED status
There are three base station modes:
•Off
•Initial power up
•On and operating
The initial power up sequence corresponds to the following steps: