Energy Base Station installation diagram

Callout

Component

Description

 

 

 

1

Energy meter

Energy meter(with housing case removed) you want to measure

2

RS-485 (+ terminal)

RS-485 (+)

3

RS-485 (- terminal)

RS-485 (-)

4

RS-485 (ground/shield)

RS-485 (ground wire)

5

RS-485 bus terminating

If a single energy meter is connected to the Modbus base station, the

 

resistor

terminating resistor must be installed.

 

 

If multiple energy meters are connected to the Modbus base station,

 

 

in a daisy chain, the terminating resistor is installed only on the last

 

 

energy meter.

 

 

 

6

RS-485 wire

RS-485 wire routed from the energy meter to the Modbus base station

7

Modbus base station

Transmits data from the energy meter to the Edge server via Ethernet

8

RJ-45 Ethernet connector

Connects to Ethernet network

9

AC power connector

Connects to power source

10

Modbus adapter (RJ-45 to

Connection point between the energy meter and the Modbus base

 

DB-9)

station

Programming the ION power meter

You must be standing at the ION power meter to program the device. It is not capable of remote programming.

1.Press and hold the UP and DOWN arrows simultaneously for a minimum of 2 seconds to access the programming mode.

2.Press the KVARh button to scroll through the available modes.

3.Press and hold the UP or DOWN arrow for a minimum of 2 seconds to move from digit to digit when adjusting values.

(Optional) Sensor Base Stations 57