
o
Callout | Component | Description |
|
|
|
1 | Component of the Modbus adapter | |
2 | Component of the Modbus adapter | |
3 | A/C power connector | Connects to the power source |
4 | CAT5 Ethernet connector | Connects to the network |
5 | Modbus adapter | Connects the |
|
| |
6 | Connects the energy meter to the Modbus base station |
5.Verify that the ION power meters are configured and meet all requirements.
6.After all hardware is installed, power up the components ("Power up procedure" on page 70).
Installation is complete.
(Optional) Sensor Base Stations 56