Installation is complete.

200A Current installation diagram

Callout

Component

Description

 

 

 

1

Power device

Any power component whose power current you want to measure

2

CH3, CH4, and CH5 CTs

Three separate current transducer channels to measure three current lines

3

Current lines

Three separate current lines measured by the CTs

4

Connection point

Low voltage wires connecting the CTs to the base station

5

Base station

Wirelessly transmits information to the Edge server

6

AC adapter

Plugs into a power source

7

Connector

Connects the base station to the AC adapter

Installing the HP Energy Base Station

The HP Energy Base Station connects to the supplied ION energy meter sensor, and then measures and reports the energy usage of the monitored power source or location. Consult a professional electrician to install the ION power meter sensor to your power source.

Depending on the power configuration of your energy meter, the following KWH Base Stations are available:

HP 208V/200A KWH Base Station

HP 208V/600A KWH Base Station

HP 480V/200A KWH Base Station

HP 480V/600A KWH Base Station

The installation procedure is the same for all Energy base stations. To install a KWH base station:

NOTE: A licensed electrician must install the ION power meters to the designated locations of the data center.