Intel Server Board SE7501CW2 Installation and Integration Guide |
|
Table of Contents |
|
Introduction | 5 |
Document Overview | 5 |
Target Audience | 5 |
Thank you | 5 |
Troubleshooting Guide | 6 |
Minimum Hardware Requirements | 6 |
Hardware Integration | 7 |
Prepare for Assembly | 7 |
Important Safety Information | 8 |
Safety Instructions and Information | 8 |
Electrostatic Discharge (ESD) | 8 |
Chassis Preparation and Server Board Installation | 9 |
About the I/O Shield | 9 |
Attaching the Gasket to the I/O Shield | 9 |
Attaching the Label to the I/O Shield | 9 |
Installing the I/O Shield | 9 |
Installing Chassis Standoffs | 10 |
Installing the Rubber Bumper | 10 |
Installing the Server Board | 10 |
Installing Memory | 11 |
Installing the Boxed Intel Xeon Processor | 12 |
Choosing the Processor Socket | 12 |
Opening the Socket Lever | 12 |
Attaching the Processor | 12 |
Installing the Retention Mechanism | 13 |
Applying Thermal Grease | 13 |
Attaching the Heat Sink and Retention Clips | 13 |
Installing the Processor Wind Tunnel | 14 |
Attaching the Heat Sink Fan | 14 |
Attaching the Fan/Intake Assembly | 14 |
Attaching the Wind Tunnel | 15 |
Making Required Connections to the Server Board | 16 |
| 3 |