Intel Server Board SE7501CW2 Installation and Integration Guide

 

Table of Contents

 

Introduction

5

Document Overview

5

Target Audience

5

Thank you

5

Troubleshooting Guide

6

Minimum Hardware Requirements

6

Hardware Integration

7

Prepare for Assembly

7

Important Safety Information

8

Safety Instructions and Information

8

Electrostatic Discharge (ESD)

8

Chassis Preparation and Server Board Installation

9

About the I/O Shield

9

Attaching the Gasket to the I/O Shield

9

Attaching the Label to the I/O Shield

9

Installing the I/O Shield

9

Installing Chassis Standoffs

10

Installing the Rubber Bumper

10

Installing the Server Board

10

Installing Memory

11

Installing the Boxed IntelXeonProcessor

12

Choosing the Processor Socket

12

Opening the Socket Lever

12

Attaching the Processor

12

Installing the Retention Mechanism

13

Applying Thermal Grease

13

Attaching the Heat Sink and Retention Clips

13

Installing the Processor Wind Tunnel

14

Attaching the Heat Sink Fan

14

Attaching the Fan/Intake Assembly

14

Attaching the Wind Tunnel

15

Making Required Connections to the Server Board

16

 

3

Page 3
Image 3
Intel SE7501CW2 manual Table of Contents